福島第一核電廠於 6 月 11 日恢復已處理水排放作業

According to Tokyo Electric Power Company, the Fukushima Daiichi Nuclear Power Station resumed treated water discharge operations on June 11, after a system alert caused an automatic halt the previous day. The alert was triggered during treated water transfer operations on June 10 at 4 p.m. local time (3 p.m. Beijing time).
免責聲明:本頁面資訊可能來自第三方來源,僅供參考,不代表 Gate 的立場或觀點,亦不構成任何財務、投資或法律建議。虛擬資產交易具有高風險,請勿僅依賴本頁資訊作出決策。詳情請參閱 免責聲明
回覆
0/400
暫無回覆